ProjectPlace WorkYearClient
Self-propelled equipements, 80tonArbatax di Tortolì2004 – TodayBelleli Costruction and Service
Self-propelled equipements, 200tonArbatax di Tortolì2004 – TodayBelleli Costruction and Service
Self-propelled equipements, 400tonArbatax di Tortolì2004 – TodayBelleli Costruction and Service
Self-propelled equipements, 600tonArbatax di Tortolì2004 – TodayBelleli Costruction and Service
Completion of secondary structure and pipeline on East Area deck GRArbatax di Tortolì2004-2005Intermare Sarda spa
Prefabrication complete structure, pipeline, equipments Deck GR2 East AreaArbatax di Tortolì2004-2005Intermare Sarda spa
Prefabrication complete structure, pipeline, equipments Deck GR2 East AreaArbatax di Tortolì2004-2005Intermare Sarda spa
Prefabrication complete West Espoir jacketArbatax di Tortolì2005Intermare Sarda spa
Coupling body for West Espoir polesArbatax di Tortolì2005Intermare Sarda spa
Prefabrication row 1A Sable jacket, preparation of temporary works and assistance with launchingArbatax di Tortolì2006Intermare Sarda spa
Extraordinary maintenance, disassembly assistance, crane modification carpentry  Arbatax di Tortolì  2006  Intermare Sarda spa
Assistence on board AwaPaloukou deck – offshoreGolfo di Guinea2007 – 2008Saipem Spa
Maintenance on board Saipem 10000Angola – Singapore – Mozambico2007 – Today Saipem spa
Maintenance on board del TADCongo2007; 2012Saipem Spa
Prefabrication plans, pipeline and assembly equipments on deck Awapaloukou deckArbatax di Tortolì2007Intermare Sarda spa
Complete prefabrication Olowi templateArbatax di Tortolì2008Intermare Sarda spa
AZ 5820 offshoreLibia2008Saipem Spa
Prefabrication stakes Maamoura 2008Saipem Spa
ProjectPlace WorkYearClient
Prefabrication Grillage Maamoura Jacket 2008Saipem Spa
Panels Prefabrication Winterization Scarabeo 8Arbatax – Palermo2009-2010Fincantieri Cantieri Navali
Scarabeo 8 Burner BoomArbatax di Tortolì2009-2010Saipem Portugal Maritimo
Vortex Stainless steel for purifiersArbatax di Tortolì2009-2010CFE Ecotech
Completion Work on DFM Substructure and Drill Floor Scrabble 8 (Prefabrication and Primary Structure and Piping Assembly, Equipment Installation, Piping line testing)  Palermo  2009-2010  Saipem Portugal Maritimo
Construction of main and secondary arm, cusp and winch cabin Crane TCR 800T. Assembly assistance and testing Arbatax – Egitto2009Belleli Costruction and Service
Maintenance on board  Scarabeo 7Angola2011Saipem spa
Main and secondary arm construction, cusp and winch cabin Crane TCR 1000TArbatax di Tortolì2011Belleli Costruction and Service
Protective treatements Elgin B Jacket Project 2011Saipem Spa
Protective treatements Kizomba Satellites ProjectArbatax di Tortolì2011-2012Saipem Energy Services spa
Protective treatements West Franklin Project, Prefabrication of temporary works and launching assistanceArbatax di Tortolì2011-2012Saipem Energy Services spa
Prefabrication and assembly Grillage + Rizzaggi 4 Buoyancy Tanks O.O.L. USAN ProjectArbatax di Tortolì2011-2012Saipem Energy Services spa
Costruction n°16 modules for refineryArbatax di Tortolì2011-2012Sices Spa / Saipem Spa
Maintenance on board Saipem 12000Angola2012Saipem Spa
Maintenance on board Perro Negro 6Congo2012Saipem Spa
Maintenance on board Scarabeo 3Congo2012 -2013Saipem Spa
Maintenance on board Scarabeo 9Cuba – Trinidad – Togo – Angola2012 – TodaySaipem Asset Luxembourg
Crane modification TRC 350 tonArbatax di Tortolì2012-2013Belleli Costruction
ProjectPlace WorkYearClient
  Prefabrication Piper line assembly and welding , Damam  Arabia Saudita  2014  SaudiArabian Saipem
  Unloading assistance, and commissioning of the craneTRC 350ton  Guarajà Brasile  2014  Saipem do Brazil
  Maintenance on board Scarabeo 7Sudafrica, Mauritius, Indonesia  2014  Saipem spa
  Maintenance and handling IntermareFabrication Yard  Arbatax di Tortolì  2014-2016  Saipem Spa
  Predrilling deck IvarAasen  Arbatax di Tortolì  2014-2015  Saipem Spa
  Rigging platform IvarAasen  Arbatax di Tortolì  2014-2015  Saipem Spa
  Prefabrication cluset A1 B2 IvarAasen  Arbatax di Tortolì  2014-2015  Saipem Spa
  Launching assistancejacket IvarAasen  Arbatax di Tortolì  2014-2015  Saipem Spa
  Prefabrication Caisson e Breathe West Hub  Arbatax di Tortolì  2017  Saipem Spa
  Welding service Romania RIG 5870  Romania  2017-2018- 2019  Saipem Sucursala Romania
ProjectPlace WorkYearClient
Factory prefabrication and assembly on the RIG 5870 of the new Drillercabin  Arbatax di Tortolì – Romania  2018-2019  Saipem Sucursala Romania
Prefabrication Launch trolley Egina project  Arbatax di Tortolì  2017-2018  Saipem Spa
Prefabrication Mechanical Item Vandumbu project  Arbatax di Tortolì  2018  Saipem Spa
Construction at our factory and assembly of new piping lines on Sabratha platform. Prefabrication in the factory and assembly on Sabratha steel platformer for Prefabbricazione in stabilimento e montaggio su Sabratha platform di piani in acciaio for structure extension  Arbatax di Tortolì- Libia    2018/2019    Saipem Spa
Construction Pony Sub 8ft. Rig 5827  Kazakhstan  2018  Saipem Kazakhstan
Prefabrication sleepers, Speadersbars 40”, 54”, counteract, project Zohr  Arbatax di Tortolì  2018-2019  Saipem Spa
Manpower for restart drilling RIG 5893Marocco2018Saipem Spa
S12K Welderndfitter for ROV installationPakistan2019Saipem Spa
Manpower for restart drilling RIG 5864Viggiano – Basilicata2019Saipem Spa
Prefabrication Steel Components for Chimney Unit 12, Central MornaguiaArbatax di Tortolì – Mornaguia Tunisia  2019  Ansaldo Energia
Prefabrication 18″, 24″ piping supports and tests for Saras refinery  Arbatax di Tortolì  2019  RAM Group